Jacobsville Fire Station
Pasadena, MD
Our Jacobsville Fire Station project is centered around the demolition of all existing utilities, underground structures, pavement, and about 15,000 sq ft of buildings before we develop and prepare the site for a new building pad with updated WSSC utilities. Site work includes general excavation, backfill, new storm drainage structures, and agreggate base/subbase paving. Close to 800 LF of conduit was installed, along with 325 LF of sanitary pipe and 200 LF of water pipe. 55,000 SQFT of asphalt was poured and 2,500 LF of curb & gutter was installed.